Recent News

Company News

Location:Home > News & Resources > Company News

Publication of Phased Rehabilitation Scheme for Drop-Drip Windmill Still Without On-Line Schedule

Date:2019-07-19 Hits:1457


On the 18th, the first media opening day was held 325 days after the downline of the drip-drip windmill. It was said that the drip-drip windmill was still on the line at a specific time and was still undergoing safety rectification, but a phased plan for the rectification period was announced.



The scheme shows that the essence of the downwind car is joint travel. In order to resist illegal operation, the downwind car will stipulate the number of orders for the owner according to the coach joint guidance in different places, and remove the nearby function of receiving orders and limit the commonly used area of receiving orders.


In addition, all sensitive information related to user privacy, such as personalized avatars, gender, long-text evaluation tags, will be permanently offline to avoid giving illegal elements the opportunity to pick the bill. In the future, the free-ride page will only show necessary travel information, and the evaluation tag will only be related to travel, such as "punctuality, courtesy" and so on.


Strengthen User Information Screening Ability


According to the rectification scheme, on the basis of the real-name authentication of all users before, Shunfeng took the lead in introducing the authentication scheme of collecting identity data dynamically in the form of video to prevent the black-born users from registering with false certificates. At the same time, the frequency of face recognition is increased in many links such as user registration, invoicing, receiving orders and getting on the bus.


In addition, the function of information checking card is also put forward by the drip-drip windmill. Both passengers can confirm twice before boarding according to the information provided by the checking card, such as the head image (provided before boarding point), the number of passengers and so on. If the passengers and cars do not match, users can report directly.


Drop by drop announce the windmill rectification measures. Zhongxin Network? Photographed by Wu Tao


Two-way confirmation prevents pick-up


The scheme shows that in the order-taking link, the platform establishes the "anti-pick-up mode" of the two-way confirmation mechanism of the division rider, that is, after the division rider releases the itinerary and matches the route, the owner can issue a joint invitation to the passengers along the way, and the passengers will receive multiple invitations and confirm the choice according to the owner's trust value and the number of trips along the route. Only after confirmation.


Provide up to $1.2 million in accident insurance

Similar to the network appointment vehicle, the windmill synchronously iterates the functions of platform 110 alarm, trip sharing, emergency contacts, route offset reminder, trip recording and so on. In terms of security, the drip-down windmill will provide the maximum 1.2 million per person coverage of accident insurance for drivers and riders free of charge for each trip, and provide security for users to travel.


Promoting exclusive protection for women


It is noteworthy that the scheme introduced exclusive protection for women. Through dripping female safety assistants, female passengers and car owners can see a series of information about the co-passenger users, such as the driving age of the current single operator, the age of the car, the specific time of face recognition and so on.


In special scenarios such as long-distance travel, the platform will also require multiple face recognition, remind female users to open travel sharing, and automatically record the trip. If abnormal conditions such as trajectory deviation and long stay occur, users will be warned and asked if user feedback is safe.


Vietnam Android Mobile Data Line Co., Ltd. is a manufacturer of mobile data line specializing in customization, development, design, manufacture and sale of USB 2.0 data line, USB 3.0 data line, Type C data line, network line, data line and other connection lines. Has a complete and scientific quality management system, through the ISO 9001 international quality management system certification; National Consulting Hotline: 86-755-88210101~2